Technical PM
- Responsible for Home Button (SSHB) and Display related failure analysis and design on Project (2021-2024)
- Design fixture and optimization AE pallet for solving Home button cosmetic offset and tilt issue, improvement yield from 20% to 90%
- Design fang boot for solving display light leakage issue
- Responsible for Power/Volume/Ringer Button and SIM/MLB related failure analysis and design on Project (2021-2024)
- Optimization AE shim selection rule and pressing fixture for solving button offset, tilt and feeling (force, travel and pressing ratio) issue, improvement yield to 97%
- Fixture design for solving SIM tray offset and tilt issue
- Responsible for whole unit water ingress (IT) and IT leader on Project (2020-2024)
- Optimize whole unit IT seal geometry/gap and liner remove location
- Crated water ingress test method and fixture for failure analysis and assembly
- Handle IT meeting and work with team and customer for issue solving
- Familiar with rubber (O-ring)/adhesive sealing compression rate design
- Responsible for the smallest of 5G phone project leader (2020-2024)
- Meet build time schedule and target, organize team communication
- Equipped with function team (RD team and Factory side) for issue solving
- Coordination with costumer and factory to make each other benefit enhancement
- Optimize human resource and new work life during COVID-19
- Responsible for project consultant for HSG/HSG sub line (2020-2022)
- Lead senior and junior engineer for NPI assembly SOP, assembly flow, fixture created, tolerance analysis, failure analysis and design suggestion for product
- Coordination with AE team for light out manufacturing plan and execution.