6 Years of experience in semiconductor industry and 5 machines installation experience. Team player comfortable in competitive, fast-paced environment. Effective in handling direct customer inquiries.
Relocate the VPG from Kagoshima (Japan) to Kaohsiung ( Taiwan)
with Japanese colleague and finish the final acceptance.
Setup installation plan and collaborate with Germany colleagues to install 2 MLA 300.
The point of contact for customer, report the condition to HQ
Answered customer telephone calls promptly to avoid on-hold wait times.
Work with TSMC facility engineers to do pre-installation.
Collaborate with Lam research engineers to install the Express and finish the acceptance.
Collaborate with mother Fab engineers to reduce false alarm around 15%.
Evaluate the 2nd source of U/E of Unity, this cost down improvement save the budget 1 million NTD/year.
Improve the contamination of wafer in TEL 8500, particle SPC chart’s Cp increase to 1.73 from 0.89
Adjust the machine parameter like gap up/down speed, 4-pin speed and decrease the stable time of B/H of recipe. Increase the daily capacity
5 pcs/day for each machine.
Hardware troubleshooting