Summary
Overview
Work History
Education
Skills
Timeline
Generic

KAI-YI TSAI

POWER ELECTRONIC ENGINEERING
Taoyuan City

Summary

Adept Power Engineer with a proven track record at Ancora Semi, enhancing power plant efficiency and reducing maintenance downtime through advanced control systems and thorough inspections. Skilled in Electrical Design and Power Distribution, with a knack for optimizing performance and integrating renewable energy solutions. Demonstrates exceptional problem-solving abilities and a commitment to energy efficiency.

Overview

10
10
years of professional experience
2
2
Languages

Work History

Power Engineer

Ancora Semi
10.2023 - Current

1. Collect and analyze product market application trends.
2. Participate in product electronic circuit design and provide development direction suggestions.
3. Provide product application solutions and application circuit design (EVB, Demo Board).
4. Product verification platform development and circuit design (special product characteristic test circuit, reliability verification circuit).
5. Assist in product quality incident analysis.
6.PCB Layout.
7. Magnetic component design.
8. Circuit simulation (PSIM).
9. Write product application note.
10. Assist customers with education and training.

Power Engineer

Chicony Power
03.2021 - 10.2023

1. High-frequency third-generation semiconductor (GaN/SiC MOS) research, design and productization.
2. Single and three-phase PFC+LLC bidirectional architecture design.

3. Used Totem-pole PFC to created 10kW PFC.

4. Enhanced power plant efficiency by implementing advanced control systems and optimizing equipment performance.

5. Troubleshot complex electrical issues in a timely manner to minimize downtime while maintaining high-quality standards for safety and functionality.

Power Engineer

LUXSHARE-ICT CO., LTD.
12.2019 - 02.2021

1. Enhanced power plant efficiency by implementing advanced control systems and optimizing equipment performance.

2. Reduced maintenance downtime by conducting thorough inspections, identifying potential issues, and addressing them proactively.

3. Troubleshot complex electrical issues in a timely manner to minimize downtime while maintaining high-quality standards for safety and functionality.

4. Optimized power distribution networks by analyzing load profiles and recommending appropriate upgrades or modifications.

5. Managed project budgets and resources effectively, ensuring successful completion within deadlines and cost constraints.

6. Used GaN Device to create 65W、130W power adaptors.

Power Engineer

Delta
01.2018 - 12.2019

1. Enhanced power plant efficiency by implementing advanced control systems and optimizing equipment performance.

2. Reduced maintenance downtime by conducting thorough inspections, identifying potential issues, and addressing them proactively.

3. Evaluated new technologies for potential integration into existing power systems to enhance overall efficiency and performance.

4. Used 6、11kW power module with three phase vienna PFC and wide range CLLC for bi-directional application.

Power Engineer

Cotek Company
07.2017 - 01.2018

1. Enhanced power plant efficiency by implementing advanced control systems and optimizing equipment performance.

2. Reduced maintenance downtime by conducting thorough inspections, identifying potential issues, and addressing them proactively.

3. Provided technical support during installation, commissioning, and startup phases of various power generation projects.

4. Supported continuous improvement efforts by conducting regular reviews of established procedures against current best practices.

Power Engineer

FSP
04.2014 - 07.2017

1. Enhanced power plant efficiency by implementing advanced control systems and optimizing equipment performance.

2. Reduced maintenance downtime by conducting thorough inspections, identifying potential issues, and addressing them proactively.

3. Optimized power distribution networks by analyzing load profiles and recommending appropriate upgrades or modifications.

4. Implemented energy-saving strategies that reduced overall operational costs while maintaining optimal performance levels.

5. Modified 300W below power system , ex: TV power, Elec- Bicycle charger.

Education

Master of Science - Electrical, Electronics Engineering Technologies

National Taipei University of Technology
Taipei City, Taiwan
04.2001 -

Skills

Battery Storage Systems

Timeline

Power Engineer

Ancora Semi
10.2023 - Current

Power Engineer

Chicony Power
03.2021 - 10.2023

Power Engineer

LUXSHARE-ICT CO., LTD.
12.2019 - 02.2021

Power Engineer

Delta
01.2018 - 12.2019

Power Engineer

Cotek Company
07.2017 - 01.2018

Power Engineer

FSP
04.2014 - 07.2017

Master of Science - Electrical, Electronics Engineering Technologies

National Taipei University of Technology
04.2001 -
KAI-YI TSAIPOWER ELECTRONIC ENGINEERING