Summary
Overview
Work History
Education
Skills
Competitive Advantages
Areas For Improvement
Position
Date Of Entry
Hobbies and Interests
Future Goals
Certification
Table Tennis
Interests
Timeline

KAI CHEN CHAN

Kaohsiung City,Nanzi Dist

Summary

Experienced Test Application Equipment Integration Engineer at ASE Semiconductor Co., Ltd. responsible for successfully introducing new products on the NPI device side of fingerprint recognition buttons. Proficient in handling the introduction and testing of various machines including AOI and protective sticker machines, 6-sided inspection machines, and air leakage detection machines. Skilled in machine automation project evaluation, development of equipment functions for evaluation products, and introduction of new machines during the engineering stage. Conducted machine verification trial production, monitored progress of new product GRR verification and automation project improvement, and collaborated with vendors on machine modifications and establishment of back-end product processes for improved yield. Strong cross-functional collaboration with other departments on projects such as adjusting AOI parameters for product optimization and managing machine projects. Demonstrated ability to oversee two production lines, showcasing expertise in machine import processes.

Overview

4
4
years of professional experience
1
1
Certification

Work History

Test Application Equipment Integration Engineer

ASE Semiconductor Co., Ltd.
02.2021 - Current
  • Company Overview: ASE Semiconductor Company is involved in the semiconductor industry, focusing on test application equipment integration
  • Responsible for the introduction of new products on the NPI device side of the fingerprint recognition button
  • Previously, there were machines responsible for the introduction and testing: AOI and protective sticker machine/AOI product 6-sided inspection machine/product air leakage detection machine
  • Work content includes machine automation project/evaluation product equipment function development, new machine introduction engineering stage Build Up, engineering stage machine verification trial production
  • Grasp the project progress of new product GRR verification and automation project improvement
  • Discussed with vendor the machine modification and the establishment of back-end product process and yield improvement
  • Cross-departmental co-work, product AOI parameter adjustment, machine project handling, and was also the person in charge of the two production lines
  • ASE Semiconductor Company is involved in the semiconductor industry, focusing on test application equipment integration
  • Familiar with machine import
  • Hope to use the experience learned on the job to introduce products into trial mass production

Education

Department of Power Mechanical Engineering

Huwei University of Science and Technology
Participated in the development of locomotive speed testing machine for my thesis.

Skills

  • NPI Product Machine Build up
  • AOI Inspection Function Build Up
  • AOI & Protective Sticker Machine Build Up
  • AOI Product 6-sided Inspection Machine Build Up
  • Cross-Departmental Communication
  • Evaluation Product Equipment Function Development
  • Problem-solving under pressure

Competitive Advantages

  • High curiosity and thirst for knowledge.
  • Ability to work under pressure.
  • Strong problem-solving skills.

Areas For Improvement

  • Time management when solving problems.
  • Accumulation of practical experiences.

Position

Equipment Engineer

Date Of Entry

02/21/25

Hobbies and Interests

  • Machinery
  • Mechanical assembly
  • Optical lens technology

Future Goals

  • Introduce products into trial mass production.
  • Handle online anomaly elimination independently.

Certification

  • Level B technician for automotive mechanic.
  • Level 1 Taiwan Automation Intelligence and Robotics
  • ASE Semiconductor Co., Ltd Excellent quality personnel

Table Tennis

National Formosa University Table Tennis school team

ASE Technology Holding Co., Ltd Table Tennis Factory team 

Interests

I have been interested in small parts and mechanical assembly since I was a child When I see parts that I don’t understand, I want to disassemble them and understand the operating principles I have a thirst for knowledge and curiosity and have high stress resistance Before doing things, I will carefully consider the consequences and figure out what may happen and how to deal with it I hope to minimize the damage and handle everything I encounter I am not afraid of troubles and face problems with a normal mind When encountering problems that cannot be handled smoothly, I will rethink the problem and work hard to solve it I have high stress tolerance for serious efforts and responsibility

Timeline

Test Application Equipment Integration Engineer - ASE Semiconductor Co., Ltd.
02.2021 - Current
Huwei University of Science and Technology - , Department of Power Mechanical Engineering
KAI CHEN CHAN