Having 15 Years of experience with knowledge of Commissioning and Operation of Combined Cycle Power Plant Strategy for optimization of operational scenarios to achieve efficient operation and energy management.
Overview
16
16
years of professional experience
Work History
Shift in Charge
GE Venova
03.2025 - Current
Combined cycle power plant consists of 1300 MW 2 on 1 with Gas Turbine 7H.03 and STF-D650 steam Turbine with surface condenser , BOP systems 6.9KV, 400V switchgears.
Reporting to Operation manger
Assisted with Team Meeting and Client Meeting.
Performing in TBM with PTW like Confide space and Hot works.
Performing Daily Report and Trip event report with accordingly.
SOP preparation for startup and shutdown.
Assisted with day-to-day operations, working efficiently and productively with all team members.
Shift in Charge
Mass Global Energy Ltd
01.2021 - 01.2025
Combined cycle power plant consists of 1500 MW 2 on 1 with Two block Gas Turbine 9F.04 and C7 steam Turbine , plant includes water treatment plant, BOP systems and 400 KV switchyards and 6.6KV, 400V switchgears.
Reporting to Operation manger
Assisted with Team Meeting
Performing in TBM with PTW like Confide space , Hot works and Acid Unloading.
Performing Daily Report and Trip event report with accordingly.
Assisted with day-to-day operations, working efficiently and productively with all team members.
SOP preparation for startup and shutdown.
Control Room Operator
Mass Global Energy Ltd
11.2018 - 12.2020
Combined cycle power plant consists of 1500 MW 2 on 1 with Four block Gas Turbine 9F.03 and C7 steam Turbine , plant includes water treatment plant, BOP systems and 400 KV switchyards and 6.6KV, 400V switchgears.
Reporting to Shift-in charge
Monitor all parameters of the unit and enter periodic readings on log sheets. Summarize all activities/events that took place during his shift in the log book.
Performing in Start-up and shut-down activities
Performing commissioning activates including steam blow-out and day to day operation activates
Assisted with day-to-day operations, working efficiently and productively with all team members.
Field Engineer
Samsung C&T Corporation
06.2017 - 09.2018
The plant will be equipped with Six Siemens SGT5-4000F Gas Turbines, Four SST5-4000 Steam Turbines and 10 SGen5-1200A Generators. It will be divided into Two Power Blocks with each Block consisting of Three Gas Turbines that will operate two downstream Steam Turbines
Safe reliable efficient operation of GTG, STG, HRSG and BOP.
Involve HRSG cold, Hot and warm start up.
Monitor all parameters of the unit and enter periodic readings on log sheets. Summarize all activities/events that took place during his shift in the log book.
To isolate the equipment for maintenance purpose with LOTO procedure.
SOP preparation for startup and shutdown
Control Room Engineer
Mass Global Energy Ltd
03.2014 - 04.2017
Combined cycle power plant consists of 1500 MW 4 on 1 with Two Block Gas Turbine GE 9E and Steam Turbine GE C7 with ACC , BOP systems and 400 KV switchyards and 6.6KV, 400V switchgears.
Monitor all parameters of the unit and enter periodic readings on log sheets. Summarize all activities/events that took place during his shift in the log book.
Performing in Start-up and shut-down activities
Performing commissioning activates including steam blow-out and day to day operation activates
Assisted with day-to-day operations, working efficiently and productively with all team members.
Control Room Operator
Thermax o&m services pvt ltd
02.2010 - 03.2014
35MW of CFBC Thermax Boiler and Siemens Steam Turbine.