I’m self-motivated and able work in fast-past environment with good teamwork among my fellow colleagues. I have a strong work ethic.
Datan Combined Cycle Power Plant Expansion Project
➢ Manages All Cable Pulling work for Datan Combined Cycle Power Plant Expansion Project unit 8&9 and technical information between Customer, Partner, Supplier, Subcontractors and Engineering team
➢ Manages Cable termination work for HRSG unit 8&9 and technical information between Customer, Partner, Supplier, Subcontractors,Engineering team
➢ Monitors Overall cable termination work, Monitors and Leading all sub contractor for cable pulling work Unit 8&9 and expedite as required
➢ Resolve technical issue, interface issue including coordinate with other discipline
➢ Site survey for planing work ahead and request scaffolding platform for cable pulling team, Safety walks and inspection working area
➢ Prepare Request for information (RFI)
Tambak Lorok Combined Cycle Power Plant Block 3, Jawa Tengah – Indonesia
➢ My responsibility is overall in charge of several construction teams on installation of cable tray, conduit, instrument device and impulse line tubing installation & hydro testing in Gas turbine, Steam turbine, Generator, WSC and HRSG area.
➢ Report to project management progress report, material reconciliation, submit progress claim.
➢ Conduct inspection with QC team, updated red-correx drawing and clearing construction, TOP
relate punch items.
➢ Monitors, managing and supervised Electrical and instrument team member to perform work as per drawing and customer requirement
➢ Monitors, managing and requesting materials for installation work
➢ Prepare Request for information (RFI)
13 Feb 2017 – 15 Feb 2019 (Electrical and Instrument Engineer)
Mae
➢ Monitors, managing and supervised Electrical and instrument team member to perform work as per drawing and customer requirement
➢ Monitors, managing and requesting materials for installation work
➢ Prepare Request for infMoh Power Plant Unit 4-7 Replacement Project (MMRP1), Thailand
➢ My responsibility is overall in charge of several construction teams on installation of cable tray,
conduit, cable pulling & termination, lighting system, lightning system, instrument device and
impulse line tubing installation & Hydro testing, including Fire alarm system in BOP areas.
➢ Report to project management progress report, material reconciliation, submit progress claim.
➢ Conduct inspection with QC team, updated red-correx drawing and clearing construction, TOP relate
punch items.
16 Feb 2019 – 15 Sep 2019 (Electrical and Instrument Engineer)
South Bangkok Replacement Project, Thailand
➢ My responsibility is overall in charge of several construction teams on installation of cable tray,
conduit, instrument device and impulse line tubing installation & hydro testing in Gas turbine, Steam turbine, Generator and WSC.
➢ Report to project management progress report, material reconciliation, submit progress claim.
➢ Conduct inspection with QC team, updated red-correx drawing and clearing construction, TOP
relate punch items.
➢ Monitors, managing and supervised Electrical and instrument team member to perform work as per drawing and customer requirement
➢ Monitors, managing and requesting materials for installation work
➢ Prepare Request for inf
My responsibility is Sales instrument device, Installation instrument device and Service instrument
device Exp. Flowmeter, Level transmitter, Level switch, pressure transmitter, Consistency transmitter
My responsible is Sales and Service instrument device Exp. Level transmitter, Level switch, pressure
transmitter
Building construction consultants company, my responsible is monitor, inspection and update
progress of M&E for condominium construction