Customer engineer offering more than 6.5 years of experience in troubleshooting, tool maintenance and customer cooperation. Applies technical expertise and diagnostic abilities toward solving problems and maintaining usability and performance.
l Local Technical Support | Applied Material OCT 2022 – PRESENT
- TSMC F12B H20E early engagement (Tool installation/Startup flow optimization/Issue control and management).
- Design and integrate preventive maintenance flow.
- TSMC F12B Resolution and GL matching engagement and optimization.
- SEMVision G7E/G10/G10E/H20 issue control and management.
- SEMVision G7E/G10/G10E/H20 down event support.
- SEMVision G10/G10E available time improvement.
l TSMC F12B DRSEM R&D Team Leader | Applied Material OCT 2018 – SEP 2022
- TSMC F12B G10 early engagement (Tool installation/Startup flow optimization/Procedure optimization).
- Cooperated with customers and summarized tool issues in TSMC RD weekly meeting.
- Dedicated in SEMVision tool particle issue, arcing troubleshooting, IQM project implement, and data analysis.
- Maintained RD tool performance and increased available time.
- Partnered with PDC GPS to share knowledge and solved hardware issues.
l Customer Engineer | Applied Material SEP 2017- SEP 2018
- SEMVision G6 to G6 Plus upgrade project.
- SEMVision G6 Plus to G7 upgrade project.
- Preventive / Corrective maintenance.
- Customer cooperation.
FY19 Q1Q2 AMT Outstanding Employee Award
Winner Team - TSMC N3 Customer Engagement and Support [2022]