Summary
Overview
Work History
Education
Skills
Additional Information
Capability
Timeline
Generic

Yen-Sheng Lin

Production planner/Operation manager
Taiwan

Summary

1. Production planner/Operation manager

2. Dive Deep

3. Logic thinking

4. Mathmetical model

Overview

13
13
years of professional experience
5
5
years of post-secondary education

Work History

Senior Operation Manager

Coupang Taiwan
12.2023 - Current
  • New FC TAO4 launch team and response for Outbound
  • Ramp up capacity from 0 to 45,000 units in 3 months
  • SOP setting for Outbound and Hub area
  • Optimize the standard process training for newcomer from 2 hrs to 30 mins
  • Labor plan and on board process
  • HTP from 15 to 30 in 3 months
  • Layout design and automation test
  • Conveyer moving route re-arrange transfer time reduce 2 mins
  • Tool plan and setting.

Material planner

Talus Manufacturing (owned by Lam Research)
07.2022 - 06.2023
  • MRP sponsor planning BOM match ratio > 90%
  • Material Rolling FCST Provide material preparation strategy, inventory drop 10%
  • Procurement/Procurement Requirement handle
  • Ship-short/Ship-with procedure define.

Production Planner

TSMC
04.2012 - 01.2022
  • ETCH & Metrology inline supervisor manage 15 operators
  • Litho & Implanter inline supervisor manage 25 operators
  • Familiar with N4X, N28, N20 to N7 process flow and well dispatch for ETCH/Litho area
  • Metrology (SCD/CDSEM/OVL) inhibition status sponsor Metrology average waiting time improve 15%, inhibition rate drop 20%
  • ETCH area transfer time improve 30 secs
  • Introduce new transfer system 'ROVER' in TSMC
  • N80/90 production line planner logic production CT drop 0.1, clip rate keep 100%
  • New Tech N90 eFlash ramp up MFG sponsor Capacity from 1K to 6K
  • N7 clip rate from 75% to 100% in 6 months
  • Project: Lot size sponsor lot size from 18.9 to 21.1 per lot
  • Project: Align to best productivity improve 3%.

Bumping MFG supervisor

TI (Texas Instruments)
08.2011 - 03.2012
  • QFP & WCSP supervisor WCSP cycle time improve 0.5 day
  • Die prepare center & Mount center supervisor set SOP for DPC & MPC
  • E-operation card implement reduce manual and miss operation.

Education

Master - Department of Industrial engineering & management

National Chiao Tung University
08.2008 - 05.2010

Bachelor - Department Mathematical Sciences

National Chengchi University
09.2004 - 05.2008

Skills

Operations Management

KPI Tracking

Strategic Planning

Employee Coaching

Additional Information

I am the eldest child in my family. My parents let us express freely in our learning process and gave us timely direction and advice. As a result, I have become an independent person with strict discipline toward myself. I graduated from National Chiao Tung university and major in industrial engineering. My research is about the Data Envelopment Analysis (DEA). DEA is the mathematical model that uses multi-objective planning to solve production problems. Due to my interest in mathematics, I took Theory of constrain and queuing theory in school, which is useful for me to enter workplace. After graduating from graduate school, I joined TI for 8 months and TSMC for 10 years. I started as in line supervisor to learn how to manage the production line, check tool efficiency and dispatching, as well as managing DL on site. After about 2 years, I was assigned a new job to improve the AMHS system in etch area and introduce the new transfer system rover to the fab. In 2015, I rotated to planner in charge of the managing production line for clip on time delivery. I need to control whole process and deliver the wafers ordered by each customer on time. I also ramp up the specialty production line N90 eflash capacity from 1K to 6K per month. From 40nm I followed TSMC to ramp up to 7nm. I chose to leave company where I worked for 10 years after reaching the peak of 7nm and completing the tasks at hand. After 7 years in production planning filed, I join the Talus Manufacturing (fully owned by Lam Research) to be Material planner. MRP handle and material rolling forecast is my major job. I need to choose planning BOM for different customer to prepare material base on order for future 1 years. The match rate is around 90%. I also need to forecast 2 years material demand for different lead time and better scale price to issue the Procurement request. I believe that I can continue contribute the knowledge I have learned during my 11 years in the semiconductor industry and the work attitude that TI, TSMC and Talus has taught me in my future career. I would like to demonstrate my ability to continue to work with my future company to accomplish one task after another.

Capability

Certification for professional Test on Trust Businesses, Proficiency Test for Bank Internal Control and Audit, TOEIC: 770, Production planning, Capacity planning, MRP, Demand and Material rolling FCST, Data analysis and performance evaluation, Automated Material Handling System, SOP define

Timeline

Senior Operation Manager

Coupang Taiwan
12.2023 - Current

Material planner

Talus Manufacturing (owned by Lam Research)
07.2022 - 06.2023

Production Planner

TSMC
04.2012 - 01.2022

Bumping MFG supervisor

TI (Texas Instruments)
08.2011 - 03.2012

Master - Department of Industrial engineering & management

National Chiao Tung University
08.2008 - 05.2010

Bachelor - Department Mathematical Sciences

National Chengchi University
09.2004 - 05.2008
Yen-Sheng LinProduction planner/Operation manager