Summary
Overview
Work History
Education
Skills
Websites
Certification
Affiliations
Languages
Personal Information
Timeline
Generic
HELMI MAHAT

HELMI MAHAT

Taipei City

Summary

T&I Installation Lead with 17 years’ experience in offshore transportation and installation projects in oil and gas and offshore wind industries. Specialized in engineering, operations, construction and decommissioning of offshore structure and facilities.

Detail-oriented team player with strong organizational skills. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success.

Overview

16
16
years of professional experience
1
1
Certification

Work History

Installation Lead Engineer

Wpd, Skyborn Renewables
05.2022 - Current
  • Prepare engineering and operations aspect for Foundation (FOU) installation engineering, documentations, loadout, transportation and installation
  • Installation and construction – FOU loadout, transportation, pile driving, heavy lifting, dredging works, survey and tolerances
  • Manage noise mitigation system (NMS) i.e Double big bubble curtain (DBBC), small bubble curtain (SBC) and noise monitoring and measurement system
  • Coordination on day-to-day operations - Heavy lift main work vessel and marine spread for installation
  • Supporting spread - spread technical selection and requirements, transportation barges
  • Demonstrated creativity and resourcefulness through the development of innovative solutions.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • FOU Installation Equipment - Gripper frame, upending hinge, upending tool, hydraulic hammers, Vibro Lifting tool (VLT), noise mitigation, measurement and monitoring system
  • Engage and manage related stakeholders and contractors to facilities operations and engineering for offshore structure installation
  • Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials.
  • Developed high-quality engineering designs and plans to meet industry standards.
  • Collaborated with other departments to facilitate successful project completion.
  • Managing various Contractors i.e NPCC, Fugro, Mammoet Giant, HTO, Sarens, Osbit, MENCK, IHC during project preparation and execution.


Client: Yunneng Wind Power Co. Ltd. | 2019 – 2024

Project: Transportation and Installation of Offshore Wind Turbines Foundation (FOU) for Yunlin Offshore Wind Farm (Taiwan)

Vessel: Seaway Yudin, Sapura 3500, DLS 4200, Blue Wind

Role: Installation Lead / Operations Engineer

  • 8m dia. of Monopile (Foundation). Weight ranging from 1740 MT to 980 MT
  • Focal point in the design, fabrication, testing and mobilization of the newly built monopile installation equipment i.e. Upending Tool, Upending Hinged and Gripper Frame to comply with engineering and project requirements.
  • Prepared technical procedures and methodology for foundation installation to comply with client and local authority’s requirement.
  • Facilitate the engineering and operational readiness for monopile loadout and transportation scopes.
  • Coordinate daily operations in Taiwan and actively looking for improvement on the overall operations using lesson learnt sessions and feedback from stakeholders.
  • Initiate contact with local suppliers for equipment and material sourcing to support operations in Taiwan.


Installation Lead / Operations Engineer

Sapura Energy
07.2008 - 05.2022
  • Lead, plan, monitor and manage engineering and technical scopes to ensure all deliverables are met within project requirements and safe project execution
  • Responsible to create and manage the interface between engineering team and operational requirements to optimize execution in an appropriate, cost effective way
  • Manage operational aspects including marine spread, logistic, procurement, fabrication, manpower and production
  • Focal point for technical interface with internal and external stakeholders e.g Clients, subcontractors, marine warranty surveyor, authorities and regulatory bodies
  • Review technical proposal, procedures, specifications, contract requirements and identify key project deliverables and plan for timely delivery.
  • Performed complex calculations to analyze and optimize engineering processes.
  • Developed cost estimates and project specifications for proposals.


Client: Sarawak Shell Berhad | 2018

Project: Transportation & Removal for F23SW Decommissioning Project

Vessel: DPDSV Sapura Constructor

Role: Operations Engineer

  • First subsea wellhead decommissioning in South East Asia.
  • Involved in decommissioning of subsea X-mas tree and components. Removal of debris cap, production guide base (PGB) and 30” Ø multi-layer wellhead casing. Internal cutting using Internal Multi String Cutter (IMCT) and recovery using Wellhead Recovery Tool (WHRT) and transportation to shore.
  • Diver-less decommissioning campaign – ROV assisted only and subsea tooling for subsea wellhead disengagement.


Client: Sarawak Shell Berhad | 2018

Vessel: Sapura 3500

Role: Operations Engineer

  • E6DP-A substructure (1500MT) and topside installation (1600 MT)
  • 10” x 67.822 km Oil pipeline installation from D35R-A to E6DP-A
  • 16” x 16.115 km Gas pipeline installation from E6DP-A to E8DR-A


Client: PCPP Operating Company Sdn Bhd | 2017

Project: Engineering, Preparation, Removal & Disposal (EPRD) services for DANA and D30 facilities decommissioning project

Vessel: Sapura 3500

Role: Operations Engineer

  • Full fledge offshore platform decommissioning utilizing internal and external cutting tools e.g. Proserv’s Internal Pipe Cutter (IPC), Diamond Wire Saw (DWS), Soil Plug Removal Tool (SPRT). Recovery on transportation barge and reefing structures in-situ. Scopes on topside de-oiling, flushing for hydrocarbon free.


Various project with Clients i.e. Petronas, Shell, Hess, Petrofac, PTTEP, MMHE | 2008 to 2017

  • Performed various jackets and topsides installation i.e. side and stern-lift, double block upending, jacket launching, tripod, wellhead platform, modules, MSF, bridge and flare tower installation, grouting works.
  • FPSO installation, decommissioning, mooring chain connections, flexible risers
  • Worked with Fabrication yard team to facilitate offshore structure fabrication to cater for offshore installation requirements


Education

Bachelor’s Degree in Mechanical Engineering (Hons) - Mechanical Engineering

Malaysia
Malaysia
06.2008

Skills

  • Work Planning and Prioritization
  • AutoCAD, Technical Drawings
  • Transportation & Installation expertise
  • Engineering Documentation & MWS Engagements
  • Problem-Solving
  • Technical reporting

Certification

  • BOSIET
  • OGUK

Affiliations

  • The Institution of Engineers, Malaysia (IEM), 102971
  • Professional Technologies of Malaysia Board of Technologists (MBOT), GT19010267

Languages

English
Native language
English
Proficient
C2
Malay
Proficient
C2

Personal Information

  • Date of Birth: 11/21/1983
  • Nationality: Malaysian

Timeline

Installation Lead Engineer

Wpd, Skyborn Renewables
05.2022 - Current

Installation Lead / Operations Engineer

Sapura Energy
07.2008 - 05.2022

Bachelor’s Degree in Mechanical Engineering (Hons) - Mechanical Engineering

Malaysia
  • BOSIET
  • OGUK
HELMI MAHAT